The options for deploying industrial carbon capture, utilisation and storage at sites where linking to a carbon dioxide transport and storage infrastructure may not be possible. UK SHARED BUSINESS SERVICES LIMITED Tender Closes 27th March

Work package 1: Examine the challenges to deployment.
Objective: Identify and examine the unique challenges associated with deploying carbon capture, usage and storage at industrial sites where a carbon dioxide transport and storage infrastructure network may not be easily developed.

Work package 2: Define the range of options for deployment.
Objective: Document the high-level options available for deploying industrial CCUS industrial sites where a carbon dioxide transport and storage infrastructure network may not be easily developed, qualitatively appraising these options with respect to cost, risk, and emission reduction potential, including how and the extent to which they will address the challenges identified in Work Package 1. 

Please ensure you review all attached information to ensure a full understanding of this requirement. All attachments can be found with the RFx attachments tab within the Emptoris System. 

This contract will be awarded based on the evaluation criteria set out in the ITQ document. 

Find out more >>>

Leave a Reply

Your e-mail address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.